Meter on Building – Underground Service (Minimum 200 Amps)

The member or electrician will completely install the meter base and entrance and will make all connections in circuit protection device. Member will make connections on bottom lugs of meter base. We will install service in member’s conduit and make connections on top lugs of meter base.

Meter on Building - Underground Service (Minimum 200 Amps) diagram. Meter base and meter (installed by REMC) 5 feet 6 inches from ground. Schedule 80 PVC pipe, and ground wire (NEC specs), and ground rod at bottom. PVC going 1 foot into ground.